Rainier Beach High School

Seattle, WA
The Rainier Beach High School replacement project is a multi-phase plan to build a new four-story facility on the same site as the existing school, which will remain open during construction. This project features GreenGirt CMH Clips and aspires to achieve LEED Platinum certification.
CategoryK–12 Education
Size2,250 Clips, 14,500 square feet
SystemGreenGirt CMH Clips, GreenGirt CMH continuous insulation system
Girt Size / Orientation / OC4", 2.5" | V | 16" OC
Insulation TypeMineral Wool
CladdingMetal Panels, ACM
SubstrateSteel Studs
ArchitectBassetti Architects
General ContractorLydig Construction Company
InstallerInsulpro Projects, Architectural Sheet Metal