Aubry Bend Middle School

Overland Park, KS

Aubry Bend Middle School in Overland Park, KS, uses 5,000 SF of the SMARTci® Building Enclosure System over steel studs, behind metal panel cladding, with polyiso insulation. It is a public middle school, designed by Hollis & Miller Architects, built by Zimmerman Construction, and installed by Schwickert’s Tecta America.

SMARTci seals this school in a continuous air- and water-tight enclosure over polyiso, controlling the infiltration that raises heating and cooling demand in the Kansas climate of hot summers and cold winters.

Category K-12 Education
Size5,000 SF
System SMARTci Building Enclosure System
Girt Size / Orientation / OC2" | H | 16" OC
Insulation TypePolyiso
CladdingMetal panels
SubstrateSteel studs
ArchitectHollis & Miller Architects
General ContractorZimmerman Construction
InstallerSchwickert's Tecta America