A2P1021

3 Ways SMARTci Building Enclosure Systems Can Reduce Costs on Your Job Site

SMARTci building enclosure system

Several factors can make or break a budget for contractors on a job site. With the SMARTci building enclosure system, you can reduce costs while still delivering the highest quality results your clients expect. Here’s how:

Using Innovative Materials

Many architects and contractors rely on familiar materials to meet project timelines and quality expectations. While this approach might seem efficient, it can mean missing out on cost-saving advancements in building technology. One such innovation is the SMARTci building enclosure system, which is engineered for superior performance and cost efficiency.

SMARTci eliminates thermal bridging, improves energy efficiency, and reduces the need for costly additional materials. This innovation not only enhances the quality of your build but also reduces long-term heating and cooling expenses for your clients. With its high performance, cost recovery from energy savings can happen in as little as two years, depending on the project size and location.

Faster, More Efficient Installation

Time is money on a job site, and any delay can escalate project costs. SMARTci helps streamline the construction process with its GreenGirt CMH sub-framing, comprising of a composite metal hybrid material, which is designed for rapid, intuitive installation. The system’s insulation retention ThermaLock eliminates the need for slow, expensive through-fastening methods for insulation retention, reducing installation time.

With SMARTci, installations can be up to four times faster than traditional building enclosure systems, thanks to its easy stack-and-go installation process with its primary components, GreenGirt CMH sub-framing and custom-profiled dual foil-faced polyiso insulation panels. This efficiency can significantly lower labor costs and help keep your project on schedule, saving you both time and money.

Reducing Material Waste

On any job site, reducing material waste is key to controlling costs. Excess material use not only increases expenses but also leads to disposal fees and wasted time. SMARTci helps minimize material waste with its precise design and efficient use of components.

GreenGirt CMH™ sub-framing is designed to be cut and fabricated on-site with minimal waste, reducing the need for excessive material ordering and cutting errors. Additionally, the systems’ custom-profiled insulation panels are manufacturer-precise and pre-cut before getting to the job site, reducing on-site labor, time, and human errors. This reduces the material wasted and the time spent correcting issues on the job site.

By reducing material waste, contractors can save on the cost of additional materials and disposal fees while maintaining a cleaner, more organized job site that operates more efficiently.

How SMARTci Can Cut Costs on Your Job

At Advanced Architectural Products, we understand the pressures of completing commercial construction projects efficiently and cost-effectively. The SMARTci building enclosure system offers a sustainable, fast-to-install solution that helps keep your project on track while saving time and money. Designed by installers for installers, SMARTci is the go-to solution for high-performance, cost-efficient builds.

Get Installation Support

Connect with your local A2P sales representative for resources and guidance on how to efficiently install the SMARTci system on your project.

Connect with Your Territory Representative

 

Related Resources:

SMARTci System Overview

A2P’s Technical Library: Installation Guides, SMARTci Specs, Submittals, BIM/REVIT files, & More.

SMARTci Projects

 


 

Frequently Asked Questions

How much faster is SMARTci to install?

SMARTci installs up to 4× faster than traditional building enclosure systems, because it combines GreenGirt CMH sub-framing with custom-profiled insulation panels and insulation retention that reduces slow, repetitive fastening steps.

Does SMARTci reduce jobsite waste?

Yes. The SMARTci system reduces waste by using manufacturer-precise, custom-profiled insulation panels and a sub-framing approach that is cut and fabricated efficiently before reaching the job site, helping cut down on scrap, rework, and disposal costs.

How long does it take for SMARTci to pay back in energy savings?

Energy-savings cost recovery with SMARTci systems can be as little as about 2 years, depending on the project size and location.