East Middle School

Westminster, MD
The East Middle School in Westminster, MD, is a 24,000 SF educational structure enhanced with the GreenGirt CMH continuous insulation system. Hord Coplan Macht designed the building, which features spray foam insulation and metal panels on metal studs. Dustin Construction, Inc., led the project as the general contractor, with installation expertly completed by Interstate Corporation.
CategoryK–12 Education
Size24,000 SF
SystemGreenGirt CMH continuous insulation system
Girt Size / Orientation / OC3.5" | H | 16" OC
Insulation TypeSpray foam
CladdingMetal panels
SubstrateMetal studs
ArchitectHord Coplan Macht
ContractorDustin Construction, Inc.
InstallerInterstate Corporation