LinkedIn Headquarters Campus

Project facts

Category Office Space
Size3,500 SF
SystemGreenGirt Max CMH™
Girt Size / Orientation / OC2" | V | 16" OC
Insulation TypeMineral wool
CladdingPlaster
SubstrateMetal studs
ArchitectStudios Architecture
General ContractorDevon Construction, Inc.
InstallerO'Donnell Plastering, Inc.
Mountain View, CA
LinkedIn Headquarters Campus in Mountain View, California, uses 3,500 square feet of GreenGirt Max CMH™ over metal studs, behind plaster cladding, with mineral wool insulation. Part of a corporate office campus, this building was designed by Studios Architecture, built by Devcon Construction, Inc., and installed by O’Donnell Plastering, Inc. A troweled plaster finish forms a single continuous surface and therefore requires a flat, rigid, and unbroken backing. The GreenGirt Max CMH girts hold that plane true and keep the insulation continuous behind it, which accounts for much of the difference between a wall’s rated value and the effective R-value it delivers once built.

Project gallery