Sable Hotel at Navy Pier

Chicago, IL

Sable Hotel at Navy Pier in Chicago, Illinois, uses 12,000 SF of GreenGirt Max CMH™ over metal studs, behind fiber cement cladding, with mineral wool insulation. It is a hotel on Navy Pier, designed by KOO Architects, built by McHugh Construction, and installed by Denk & Roche Builders.

GreenGirt Max CMH provides a horizontal support plane for the fiber cement over metal-stud construction, carrying the facade outside the insulation layer while keeping a continuous exterior plane and a thermal break at each girt. For a hotel exterior, that combination is the basis of a thermally broken cladding support system.

Category Hospitality
Size12,000 SF
SystemGreenGirt Max CMH™
Girt Size / Orientation / OC2" | H | 24" OC
Insulation TypeMineral wool
CladdingFiber cement
SubstrateMetal studs
ArchitectKOO Architects
General ContractorMcHugh Construction
InstallerDenk & Roche Builders