San Bernardino Welcoming Resource Center

Project facts

CategoryPublic works
Size32,000 SF
SystemSMARTci® building enclosure system
Girt2" | H | 16" OC
Insulation TypePolyiso
CladdingPlaster
SubstrateMetal studs
ArchitectRuhnau Clarke Architects
General ContractorBernards
InstallerCaston Inc.
San Bernardino, CA
San Bernardino Welcoming Resource Center in San Bernardino, California, uses 32,000 square feet of the SMARTci® building enclosure system over metal studs, behind plaster cladding, with polyiso insulation. It is a school district family resource center providing services, workshops, and community events, designed by Ruhnau Clarke Architects, built by Bernards, and installed by Caston Inc. Plaster is a rigid, wet-applied finish that cracks if its backing moves, so it requires a continuous, stable plane. SMARTci provides that within an air- and water-tight enclosure over polyiso, holding the insulation continuous across the metal studs.

Project gallery